High School Extension and Refurbishment

This project involved the extension of the school sports hall to provide new and enlarged boys and girls changing rooms. A new boot room was constructed and refurbishment works were carried out to the existing office areas, together with some associated external works. The project was completed before time with minimal disruption, despite being in the middle of a large and fully functioning school complex. 

 

Client Testimonial

 “We have found the team to be calm, positive, and willing to engage pro-actively to improve aspects of the design as the building work progresses.”

Items of work included:

  • Demolitions and strip out works 
  • Extension sub-structure 
  • Foul and surface water drainage 
  • Extension superstructure 
  • Steel framed roof structure
  • Composite insulated roof sheeting and associated detailing with aluminium rainwater goods
  • Floor constructions and screeding
  • Aluminium external joinery
  • Internal wall and ceiling constructions including plastering, MF ceilings and fireproofing works
  • Internal joinery package
  • Full mechanical and electrical design and installation
  • Wall and floor finishes including vinyl, carpet and complete decorations to new and affected areas
  • Fitted furniture including bespoke changing room benches
  • External works including paths and retaining walls.